The Mad Dash To Build Data Centers

The mad dash to build A.I. data centers has become a rush into high capital cost, massive, energy-consuming behemoths delivering low margin, undifferentiated services – simple electrons in water and HVAC – cooled buildings – destroying beautiful communities in the process.

America is at an inflection point in technology – and that point is at the END of the centralized data center era – not its beginning.

For decades computer scientists knew there were ways to limit I/O – input/output – which is about all data centers do – in such a way that any application could run 1,000 times faster.

That means any application needs only 1/1,000th the computer equipment, the power and likely 1/10th the cost.

The computer software industry spent 40 years getting fat margins and never having to optimize I/O because data centers were pretty much available to them and customers had no other buying alternatives.

Those days are now over.

Low I/O technologies have been growing, below the tech press reporting – for a decade. They are now available from several vendors and they make one large poing:

There is no application – A.I. or conventional – that needs a data center.

Or better said, none need a NEW, hyperscaler data center – none.

The response from the data center crowd who care nothing about destroying rural America is that the data center – the huge new ones – are critical to America’s security.

Destroy the data center – destroy America’s ability to respond.

Low I/O and emerging quantum computing technology solved this problem. 

Today, low I/O computing is available on current hardware enabling quantum speeds and low cost computing.

These speeds achieve quantum speeds – defined as running about 1,000 times faster – by optimizing I/O, which is the back and forth data gathering when the user hits the enter key.  Over 90% of all activity in modern data centers is about processing I/O.

If I/O can be optimized, the need for data centers vanishes.

Once a state or corporation commits to building a data center, that commitment is almost impossible to unwind. 

As low I/O technologies continue to grow in market share – at a price point 90% lower than any current technology, those data centers become stranded assets which have destroyed beautiful farmland.

The local electric bills – unfortunately – will reflect those data center anticipated demands for decades.

Data centers consume often 450,000 gallons of water a day and the electricity of a town of 25,000. 

The issue that current technology – requiring data centers – is obsolete has been resolved. 

When a new technology can do the work of a previous technology, at a 90% cost reduction, migrating any application in 90 days or less, obsolete become unarguable.

These data centers – the new, hyperscalers – will be obsolete because they cannot compete when competitive solutions are 90% less cost and run 1,000 times faster.

Stranded assets are their future.